,

Bad Gateway Workspace One 3.3.4 issue

by

Had the following problem when workspace one 3.3.4 cluster hadn’t been shutdown correctly (The Environment is VCF 4.2):

NSX site was down:

Each identity manager site was down on each of the three nodes:

The fix came from vRealize suite lifecycle manager.

In Environments:

Click on the three dots to bring up a menu

The power off failed for me the first time around, however if i shutdown the VM’s from vCenter the power on was successful using lifecycle manager.

The power on process has a number of remediate steps built in:

From now on I’ll make sure to power on and off using lifecycle manager 🙂

Leave a Reply

Your email address will not be published. Required fields are marked *